This is a new house that is being constructed with slab on grade (no basement).
The plumbing has been installed under the cement to be poured. Also under the slab, it will be a central source of heat with a pump to push the heated liquid throughout the structure. The floor will be warm, note also the styrofoam insulation complete with wire mesh which gives strength to the slab from cracking.