1. Styrofoam insulation has been applied around the perimeter to minimize thermal bridging with Styrofoam underneath the slab and 4 feet out from the perimeter
2. As can be seen at the edge of the slab the concrete was well poured, and smooth with the helicopter.
3. Slab is being smoothed by a helicopter, for the wood framing application.
4. Slab pour now complete, ready for framing on top in coming weeks.